Eskalon is running fine and i think i've finally managed to fix the intermittent brown out on the points at Eskalon station. Here are a selection of photos from the latest operations.
Friday, January 30, 2015
Sunday, January 11, 2015
Siding realignment
One of the sidings in (what will become the freight depot) has been lifted and relaid along a more sensible parallel alignment rather than as a spur. The new siding is a bit shorter but looks more sensible (and is still long enough for the push-pull passenger train). The space released will allow me to have a road behind the station. Its interesting how the ballast mat has "weathered" as shown by the line under the old track alignment.
Labels:
track
Subscribe to:
Posts (Atom)