One of the sidings in (what will become the freight depot) has been lifted and relaid along a more sensible parallel alignment rather than as a spur. The new siding is a bit shorter but looks more sensible (and is still long enough for the push-pull passenger train). The space released will allow me to have a road behind the station. Its interesting how the ballast mat has "weathered" as shown by the line under the old track alignment.